Diamantina Developmental Road (Quilpie – Windorah), widen and seal
Works involve widening to 8m and sealing a 4.7km section of the Diamantina Developmental Road (Quilpie – Windorah)...
Works involve widening to 8m and sealing a 4.7km section of the Diamantina Developmental Road (Quilpie – Windorah)...
We own and maintain over 430 pieces of marine infrastructure valued at about $153 million. These include assets such as state boat harbours, boat ramps, jetties, pontoons, floating walkways, channels...
The Cairns Bruce Highway Upgrade master plan was released in 2010. It was the result of a planning study that investigated long term, multi-modal transport planning options to address the impacts of...
The department is delivering an $19.341 million program of upgrades on 4 sections of Gillies Range Road between Gordonvale and Atherton to enhance safety...
We are undertaking the detailed design phase for the Watland Street to Sports Drive section of the Pacific Motorway (M1), as part of a rolling program of M1 upgrades...
Coomera Connector (Stage 1) is around 16km and will be delivered in 3 construction packages. Stage 1 North, which is currently under construction, is the 4km section from Shipper Drive to Helensvale...
We are undertaking the Eight Mile Plains to Daisy Hill upgrade that will improve 8kms of the Pacific Motorway M1 between the Gateway Motorway and Loganlea Road...
The Bruce Highway Safety Package – Emu Creek to Drays Road is being delivered as part of the Bruce Highway Upgrade Program, a 15-year, $12.6 billion program of works aimed at improving safety, flood...