Pacific Motorway M1 North upgrade program

The Pacific Motorway M1 North upgrade program is being delivered in a 3-stage rolling program from north to south:

Benefits

  • Improves safety
  • Increases traffic flow
  • Reduces peak hour congestion
  • Contributes to economy
  • Better road access
  • Increases capacity

15 Projects in Pacific Motorway M1 North upgrade program

No image supplied

Bruce Highway (Mackay - Proserpine), Jumper Creek, upgrade flood immunity

Upgrades to improve flood immunity at Jumper Creek, between Mackay and Proserpine are now complete.

No image supplied

Bruce Highway (Mackay – Proserpine), Goorganga Plains, plan and preserve

The Bruce Highway upgrade project at Goorganga Plains and Myrtle Creek, near Proserpine, aims to plan and preserve the road corridor to enhance flood immunity and address access issues during wet weather events. 

No image supplied

Bruce Highway (Mackay – Proserpine), Knobels Road, upgrade intersection and approaches

Construction has started at the Knobels Road and Nebia Coningsby Road intersection to improve safety and enhance visibility.

No image supplied

Bruce Highway (Proserpine - Bowen), Emu Creek to Drays Road, various locations, widen formation

Safety upgrades have been completed to almost 20km of the Bruce Highway from Proserpine to Bowen, as part of the Bruce Highway Upgrade Program.

Eton Range

Eton Range Realignment Project

Eton Range fully opened to traffic on 1 October 2020. The existing range has been upgraded to 4 lanes, added a split carriageway for part of the range and reduced the grade to improve safety and efficiency.

No image supplied

Mackay Port Access, Bruce Highway to Mackay - Slade Point Road (Stage 1)

Mackay Port Access will provide a direct link for freight movements from the Mackay Port to the Mackay Ring Road, and west to the Bowen Basin coal fields via the Walkerston Bypass and Peak Downs Highway.

Pioneer River construction Mackay Ring Road

Mackay Ring Road

An improved link has been delivered from the south to the northern suburbs reducing traffic through Mackay.

No image supplied

Mackay – Bucasia Road, capacity upgrades and duplication planning

Planning is underway to identify potential future upgrades to Mackay – Bucasia Road to improve congestion, safety, and flooding impacts on this vital link to the Northern Beaches.

Aerial view of Pacific Motorway through Springwood

Pacific Motorway (M1) – Daisy Hill to Logan Motorway upgrade

Planning is underway for the Pacific Motorway (M1) – Daisy Hill to Logan Motorway upgrade. This section of the M1 cannot accommodate current traffic volumes and, as a result, experiences frequent and prolonged periods of congestion and poor travel time reliability.

M1 M3 Gateway merge

Pacific Motorway Upgrade M1 M3 Gateway merge

Construction to upgrade the M1/M3 Gateway merge to improve safety and reduce peak hour congestion was completed in May 2020.

An aerial view of the Pacific Motorway Eight Mile Plains to Daisy Hill upgrade project.

Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade

Work is being undertaken on the Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade, to improve 8kms of the Pacific Motorway (M1) between the Gateway Motorway and Watland Street.

No image supplied

Proserpine - Shute Harbour Road, Paluma Road to Tropic Road (Cannonvale), duplication

An upgrade is being delivered to a 1.5km section of Proserpine-Shute Harbour Road in Cannonvale.

Proserpine – Shute Harbour Road, Hamilton Plains, flood immunity upgrade

A flood immunity upgrade will be delivered to a 1.5km section of Proserpine – Shute Harbour Road at Hamilton Plains between the Bruce Highway turn-off and Strathdickie Road.

Walkerston Bypass map detail several upgrades

Walkerston Bypass

The Walkerston Bypass will deliver a new 2-lane rural highway to connect Peak Downs Highway west of Walkerston to the Mackay Ring Road near Paget.