Pacific Motorway Upgrade M1 M3 Gateway merge
Construction to upgrade the M1/M3 Gateway merge to improve safety and reduce peak hour congestion was completed in May 2020.
CompletedConstruction to upgrade the M1/M3 Gateway merge to improve safety and reduce peak hour congestion was completed in May 2020.
CompletedWork is being undertaken on the Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade, to improve 8kms of the Pacific Motorway (M1) between the Gateway Motorway and Watland Street.
ConstructionPlanning is underway for the Pacific Motorway (M1) – Daisy Hill to Logan Motorway upgrade. This section of the M1 cannot accommodate current traffic volumes and, as a result, experiences frequent and prolonged periods of congestion and poor travel time reliability.
PlanningThis project will see the road duplicated between Mount Warren Boulevard and Tallagandra Road.
This project involves a 62km realignment and upgrade of the Bruce Highway to 4 lanes between Cooroy and Curra and is among Queensland's highest priority road projects.
This intersection is identified for an upgrade due to the rapid expansion of local urban areas, increased traffic volumes and crash history.
The intersection of Currumbin Creek Road and Bienvenue Drive, at Currumbin Waters will be upgraded.
We’re directly connecting the eastern communities of the Sunshine Coast to South East Queensland’s passenger rail network – making it easier to travel locally, and to and from the Sunshine Coast.
This project will deliver upgrades to Riverway Drive, between Allambie Lane and Dunlop Street, to improve safety and alleviate traffic congestion.
The department has been investigating options to reduce traffic congestion and improve safety and freight access for the Linkfield Road Overpass in Bald Hills.
The department has identified a preferred option for the future upgrade of Maroochydore Road, Kunda Park to improve the existing transport network by enhancing network reliability and improving access options.
The Mooloolaba Road and Sugar Road intersection project is an interim measure to better manage traffic flow. An upgrade to the intersection will help to minimise delays, congestion and queuing, and improve safety along this busy section of the network.
The department is working with the Department of Defence to upgrade the entrance to the Borneo Barracks from the New England Highway at Cabarlah.
Planning is underway for the Pacific Motorway (M1) – Daisy Hill to Logan Motorway upgrade. This section of the M1 cannot accommodate current traffic volumes and, as a result, experiences frequent and prolonged periods of congestion and poor travel time reliability.
Construction to upgrade the M1/M3 Gateway merge to improve safety and reduce peak hour congestion was completed in May 2020.
Work is being undertaken on the Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade, to improve 8kms of the Pacific Motorway (M1) between the Gateway Motorway and Watland Street.
Construction will commence this year on a new roundabout at the intersection of Tin Can Bay Road and Bayside Road, at Tin Can Bay.
The Bremer River Bridge project includes critical rehabilitation and strengthening repair works, including bridge re-decking, to extend the life of the existing westbound bridge structure.
Last updated: 30 May 2024