Gateway Motorway and Bruce Highway upgrades

The department is undertaking integrated planning for the Gateway Motorway and Bruce Highway Upgrades in north Brisbane and the Moreton Bay Region.

Each day, around 160,000 vehicles travel between the Moreton Bay Region and north Brisbane on the Gateway Motorway, Bruce Highway and Gympie Arterial Road.

Significant population growth is increasing travel demand through this road corridor, with current traffic levels expected to increase by around 50% by 2041.

These projects are part of an integrated approach to planning for the Gateway Motorway and Bruce Highway Upgrades that investigate:

Benefits

  • Improves safety
  • Increases capacity
  • Improves network efficiency
  • Reduces peak hour congestion
  • Better road access
  • Reduces travel time
  • Contributes to economy
  • Contributes to regional growth
  • Better active transport

Flythrough video

Video Transcript

00:00

Video starts - zoomed out map of north Brisbane area.

Green line depicts project extents - from south: starting at Gateway Motorway at Bracken Ridge, extending north to merge with the Bruce Highway, continuing north on the Bruce Highway through Dohles Rocks Road interchange and north until just south of Anzac Avenue.

  • Labels point to key areas of interest along the green line:
  • Project section: Gateway Motorway (Bracken Ridge to Pine River)
  • Key area: Gateway Motorway – Bracken Ridge curve
  • Project section: Bruce Highway (Gateway Motorway to Dohles Rocks Road)
  • Key area: Major upgrade at the Gateway Motorway/Bruce Highway/Gympie Arterial Road interchange
  • Key area: Dohles Rocks Road exit and entry ramps upgraded
  • Directional labels:
    • To Brisbane (down)
    • To Sunshine Coast (up)

00:34

Labels: Benefits (icons):

  • Increase capacity and reduce congestion
  • Improve safety
  • Improve freight efficiency
  • Better active transport

00:43  

Label: Upgrading one of Queensland’s busiest road corridors

Label: Traffic levels to increase by more than 50 per cent in 20 years on the Gateway Motorway and Bruce Highway

01:00

Zooms to start the ‘flythrough’ at the southern extent of the project

Gateway Motorway at Depot Road - facing northbound.

Moving northbound along Gateway Motorway starting at Depot Road Bracken Ridge, near the Deagon Deviation.

Labels: Gateway Motorway and Deagon Deviation

Label: Additional lanes in both directions (on the Gateway Motorway)

Label: 100km/hr speed limit

01:14

Gateway Motorway is lowered as it curves to the left, under the new Bracken Ridge Road overpass and reconfigured interchange.

Around the curve, the widened Gateway Motorway continues west towards the merge with Bruce Highway.

Label: Gateway Motorway is lowered

Label: Bracken Ridge Road over the motorway

Label: Bracken Ridge Road Exit ramp

Label: Bracken Ridge Road

Label: Upgraded Bracken Ridge Road Exit and Entry ramps

01:46

Upgraded Bracken Ridge Road entry and exit ramps shown joining Gateway Motorway, on left.

Tinchi Tamba Wetlands (on right of motorway)

Label: Fauna fencing along Tinchi Tamba Wetlands (on right of motorway corridor)

Label: New bridges over Bald Hills Creek.

Label: Potential fauna underpass (shown near Bald Hills Creek corridor)

02:02

Label: Wyampa Road

Upgraded Wyampa Road overpass bridge travels over the top of the Gateway Motorway lanes.

Northbound collector-distributor road exit lanes shown on the left of the motorway.

Southbound collector-distributor road lanes enter/merge with motorway on the right.

02:13

Top left of screen: orange line depicts future upgrades to the Gympie Arterial Road

Label: Future upgrades Gympie Arterial Road

02:14

Label: major interchange upgrade

02:17

Flythrough comes into the Gateway Motorway/Bruce Highway/Gympie Arterial interchange

Label: Gateway Motorway priority connection at 100km/hr.

Gateway Motorway merges with the Bruce Highway at ground level.

Northbound collector-distributor road traffic travels on flyover over the Gympie Arterial Road, arcs to the left and then joins/merges to run adjacent to the Bruce Highway, northbound.

Label: Potential fauna overpass

Label: To Gympie Arterial Road

Label: Bruce Highway

02:30

Southbound collector-distributor roads are depicted on the right of screen, with exiting traffic joining the Gateway Motorway, curving to the right.

Southbound collector-distributor traffic exiting to Gympie Arterial Road travels on a flyover over the Bruce Highway corridor to merge with the Gympie Arterial Road.

Label: Southbound collector-distributor

02:37

Flythrough travels north along the widened Bruce Highway, extending over the Pine River.

Northbound and southbound collector-distributor roads are shown on either side of the Bruce Highway (northbound on left, southbound on right of highway corridor).

Additional bridges are shown over Pine River on either side of Bruce Highway to accommodate the CD roads.

Label: Northbound collector-distributor

02:40

A green highlighted line is shown on the right-hand side of the new southbound collector-distributor road, depicting the new shared pathway for pedestrians and bike riders extending north, adjacent to the Bruce Highway road corridor.

Label: Shared path over the Pine River (right hand side-East)

02:41-6           

Label: Potential fauna underpass, on northern side of the Pine River. To assist east-west fauna movements under the Bruce Highway corridor.

02:58

Flythrough continues north, depicting widened Bruce Highway and additional northbound/southbound collector-distributor roads on either side of the Bruce Highway corridor.

Label: Bruce Highway to Sunshine Coast

03:13

Northbound collector-distributor road exits to the left of screen to Dohles Rocks Road.

Label: Collector-distributor exits to Dohles Rocks Road

03:13

Southbound collector-distributor road from Dohles Rocks Road enters on the right of the screen.

Label: Dohles Rocks Road entry to collector-distributor.

03:27

Flythrough slows to hover at the Bruce Highway - Dohles Rocks Road interchange.

Dohles Rocks Road runs east-west under the Bruce Highway corridor.

03:28

Flythrough stops moving - looking north:

Label identifies the start of the Bruce Highway (Dohles Rocks Road to Anzac Avenue) Stage 1 project.

On left:

  • Label: New extended entry ramp
  • Orange line: depicts new entry ramp extending north on Bruce Highway from Dohles Rocks Road.

On right:

  • Label: New extended exit ramp
  • Orange line: depicts new exit ramp extending south from Bruce Highway to meet Dohles Rocks Road.

03:35

  • Music stops. Branding slides. Australian Government logo and Queensland Government logos.

Video ends.

Community consultation

Have your say

Community consultation for 2023 has closed.

The department would like to thank the community for providing feedback on the recommended planning for Gateway Motorway (Bracken Ridge to Pine River) and Bruce Highway (Gateway Motorway to Dohles Rocks Road).

TMR will continue to engage the community and provide further opportunities for feedback when planning progresses to design and construction. For more information, visit the consultation page.

Previous consultation

The community and key stakeholders provided their feedback during community consultation from October to December 2022.

This feedback was considered to inform the development of the three business cases. 

A summary of the feedback is available to view.

Community impacts

The department recognises these upgrades will create changes in the local areas and we are committed to minimising these as much as possible as planning progresses.

Property

Property impacts are expected from the upgrades, and we are engaging with impacted property owners. 

Environmental management

There will be impacts on some surrounding wetlands and park areas. We are working to minimise these impacts with local environmental and community groups wherever possible.

Noise 

Planning is considering potential changes to road traffic noise. This will include identifying possible noise treatment such as noise barriers.

Gateway Motorway and Bruce Highway upgrades location map

Map depicting area of Gateway Motorway and Bruce Highway Upgrades area.  Starts from Gateway Motorway at Bracken Ridge and extends north through to the interchange with Bruce Highway and Gympie Arterial Road, crossing the Pine River and on the Bruce Highway through the Dohles Rocks Road interchange then extending north to Anzac Avenue interchange. The map shows the project area extending south from Bruce Highway onto Gympie Arterial Road through to Strathpine Road.

Map depicting area of Gateway Motorway and Bruce Highway Upgrades area. Starts from Gateway Motorway at Bracken Ridge and extends north through to the interchange with Bruce Highway and Gympie Arterial Road, crossing the Pine River and on the Bruce Highway through the Dohles Rocks Road interchange then extending north to Anzac Avenue interchange. The map shows the project area extending south from Bruce Highway onto Gympie Arterial Road through to Strathpine Road.

20 Projects in Gateway Motorway and Bruce Highway upgrades

Burdekin River Bridge

Burdekin River Bridge, rehabilitation program

The department is undertaking the rehabilitation and maintenance program for the Burdekin River Bridge to preserve the structural integrity of the bridge. The ongoing program will ensure a safe and durable crossing is maintained for the long-term use of vehicles, heavy transport operators, rail operations, bicycle riders and pedestrians.

No image supplied

Bruce Highway (Bowen-Ayr), Inkerman overtaking lane and safety improvement projects

Safety on the Bruce Highway at Inkerman will be improved through the installation of new northbound overtaking opportunity and upgrades to the Mount Inkerman Road intersection.

Aerial view of road, trees, cars and houses

Bruce Highway (Brisbane - Gympie), Gateway Motorway to Dohles Rocks Road upgrade (Stage 1)

The Bruce Highway - Gateway Motorway to Dohles Rocks Road (Stage 1) project is part of integrated planning for the Gateway Motorway and Bruce Highway Upgrades in north Brisbane and the Moreton Bay Region.

No image supplied

Bruce Highway (Brisbane - Gympie), Gateway Motorway to Dohles Rocks Road upgrade (Stage 2), detailed design

The Bruce Highway - Gateway Motorway to Dohles Rocks Road (Stage 2) project is part of integrated planning for the Gateway Motorway and Bruce Highway Upgrades in north Brisbane and the Moreton Bay Region.

Artist’s impression of the extended north-facing ramps at Dohles Rocks Road interchange on the Bruce Highway, looking north.

Bruce Highway (Brisbane-Gympie), Dohles Rocks Road to Anzac Avenue upgrade (Stage 1)

The department is delivering staged upgrades to manage increasing traffic demands on this section of the Bruce Highway. Stage 1 includes extended north-facing ramps from Dohles Rocks Road to Anzac Avenue.

Gairloch floodway on the Bruce Highway north of Ingham

Bruce Highway (Ingham – Innisfail), Gairloch Floodway, improve safety

Planning has started to improve safety and reduce the time of closure due to flooding on a complex section of the Bruce Highway at the Gairloch floodway, approximately 6km north of Ingham.

No image supplied

Bruce Highway (Townsville to Ingham) safety improvements and rest area upgrade projects

Bruce Highway works, between Townsville and Ingham, are underway to improve safety and upgrade a rest area.

Project location map of Leichhardt Creek to Abergowrie Road construction area to widen pavement.

Bruce Highway (Townsville-Ingham), Leichhardt Creek to Abergowrie Road, widen pavement and improve safety

Bruce Highway upgrades between Leichhardt Creek and Cassowary Creek (about 42km north of Townsville).

The map shows the locality of the existing Bruce Highway, from south of Ingham, north through the Gairloch floodway and up to the Cardwell Range. Cardwell is northeast of the map. A solid dark blue line west of the Bruce Highway indicates the current proposed Ingham to Cardwell deviation project corridor. This is known as the Western 2A Deviation, which has been gazetted as future state-controlled road. The local road network, including Halifax Road and Lannercost Street are also highlighted on the map.

Bruce Highway, (Ingham – Innisfail) Ingham to Cardwell Range Deviation, plan and preserve corridor

The department has been actively working with the community to address the challenges associated with the Bruce Highway from South of Ingham to the Cardwell Range.

Douglas Garbutt Road - Safe Roads Projects in Townsville

Douglas – Garbutt Road (Townsville), various locations (Stage 1), improve intersections

Safety upgrades will be carried out at various locations along Douglas – Garbutt Road.

No image supplied

Garbutt - Upper Ross Road (Riverway Drive) (Stage 2), Allambie Lane to Dunlop Street, duplicate to four lanes

This project will deliver upgrades to Riverway Drive, between Allambie Lane and Dunlop Street, to improve safety and alleviate traffic congestion.

Aerial view of roads, cars, trees and houses

Gateway Motorway, Bracken Ridge to Pine River upgrade

The Gateway Motorway (Bracken Ridge to Pine River) project is part of integrated planning for the Gateway Motorway and Bruce Highway Upgrades in north Brisbane and the Moreton Bay Region.

No image supplied

Gregory Developmental Road (Charters Towers - Lynd), package of works

The package of Gregory Developmental Road upgrades is delivering a stronger and wider surface, improving travelling conditions for motorists and upgraded a major culvert to improve flood resilience.

No image supplied

North Queensland Principal Cycle Network, Townsville City Centre to James Cook University

The Townsville City Centre to James Cook University bikeway planning project will establish a long-term vision to provide a fit-for-purpose, interconnected and safe bike route between the Townsville City Centre and the University Drive underpass in Annandale.

North Ward Road, Townsville - Safer Roads Projects program in Townsville

North Ward Road (Townsville), various locations (Stage 1), improve intersections

Safety upgrades will be carried out at various locations along North Ward Road.

No image supplied

Townsville Connection Road (Idalia), University Road to Bowen Road Bridge, improve safety

The Townsville Connection Road is being upgraded to dual lanes between University Road and Bowen Road Bridge. The project includes upgrades at 3 intersections: Gartrell Drive, Mervyn Crossman Drive/Fairfield Waters Drive and Kokoda Street.

No image supplied

Townsville Connection Road (Stuart Drive), Bowen Road Bridge (Idalia), duplicate bridge and approaches

The department is building a new upstream bridge over the Ross River in Townsville, adjacent to the existing Bowen Road Bridge. This will increase the capacity of the river crossing from 2 to 4 lanes.

Townsville Eastern Access Rail Corridor

Townsville Eastern Access Rail corridor

We are planning for the Townsville Eastern Access Rail Corridor (TEARC) project, a proposed 8.3km rail freight line connecting the North Coast rail line directly into the Port of Townsville.

Hervey Range Developmental Road interchange (looking north), photo shows two overpasses and traffic traveling across the overpasses and underneath

Townsville Ring Road (Stage 5)

The Townsville Ring Road Stage 5 project, a landmark initiative that has brought about substantial improvements in road safety, traffic flow and travel time predictability for both freight and passenger vehicles along the Bruce Highway in Townsville, has been completed.