Gateway Motorway and Bruce Highway upgrades

The department is undertaking integrated planning for the Gateway Motorway and Bruce Highway Upgrades in north Brisbane and the Moreton Bay Region.

Each day, around 160,000 vehicles travel between the Moreton Bay Region and north Brisbane on the Gateway Motorway, Bruce Highway and Gympie Arterial Road.

Significant population growth is increasing travel demand through this road corridor, with current traffic levels expected to increase by around 50% by 2041.

These projects are part of an integrated approach to planning for the Gateway Motorway and Bruce Highway Upgrades that investigate:

Benefits

  • Improves safety
  • Increases capacity
  • Improves network efficiency
  • Reduces peak hour congestion
  • Better road access
  • Reduces travel time
  • Contributes to economy
  • Contributes to regional growth
  • Better active transport

Flythrough video

Video Transcript

00:00

Video starts - zoomed out map of north Brisbane area.

Green line depicts project extents - from south: starting at Gateway Motorway at Bracken Ridge, extending north to merge with the Bruce Highway, continuing north on the Bruce Highway through Dohles Rocks Road interchange and north until just south of Anzac Avenue.

  • Labels point to key areas of interest along the green line:
  • Project section: Gateway Motorway (Bracken Ridge to Pine River)
  • Key area: Gateway Motorway – Bracken Ridge curve
  • Project section: Bruce Highway (Gateway Motorway to Dohles Rocks Road)
  • Key area: Major upgrade at the Gateway Motorway/Bruce Highway/Gympie Arterial Road interchange
  • Key area: Dohles Rocks Road exit and entry ramps upgraded
  • Directional labels:
    • To Brisbane (down)
    • To Sunshine Coast (up)

00:34

Labels: Benefits (icons):

  • Increase capacity and reduce congestion
  • Improve safety
  • Improve freight efficiency
  • Better active transport

00:43  

Label: Upgrading one of Queensland’s busiest road corridors

Label: Traffic levels to increase by more than 50 per cent in 20 years on the Gateway Motorway and Bruce Highway

01:00

Zooms to start the ‘flythrough’ at the southern extent of the project

Gateway Motorway at Depot Road - facing northbound.

Moving northbound along Gateway Motorway starting at Depot Road Bracken Ridge, near the Deagon Deviation.

Labels: Gateway Motorway and Deagon Deviation

Label: Additional lanes in both directions (on the Gateway Motorway)

Label: 100km/hr speed limit

01:14

Gateway Motorway is lowered as it curves to the left, under the new Bracken Ridge Road overpass and reconfigured interchange.

Around the curve, the widened Gateway Motorway continues west towards the merge with Bruce Highway.

Label: Gateway Motorway is lowered

Label: Bracken Ridge Road over the motorway

Label: Bracken Ridge Road Exit ramp

Label: Bracken Ridge Road

Label: Upgraded Bracken Ridge Road Exit and Entry ramps

01:46

Upgraded Bracken Ridge Road entry and exit ramps shown joining Gateway Motorway, on left.

Tinchi Tamba Wetlands (on right of motorway)

Label: Fauna fencing along Tinchi Tamba Wetlands (on right of motorway corridor)

Label: New bridges over Bald Hills Creek.

Label: Potential fauna underpass (shown near Bald Hills Creek corridor)

02:02

Label: Wyampa Road

Upgraded Wyampa Road overpass bridge travels over the top of the Gateway Motorway lanes.

Northbound collector-distributor road exit lanes shown on the left of the motorway.

Southbound collector-distributor road lanes enter/merge with motorway on the right.

02:13

Top left of screen: orange line depicts future upgrades to the Gympie Arterial Road

Label: Future upgrades Gympie Arterial Road

02:14

Label: major interchange upgrade

02:17

Flythrough comes into the Gateway Motorway/Bruce Highway/Gympie Arterial interchange

Label: Gateway Motorway priority connection at 100km/hr.

Gateway Motorway merges with the Bruce Highway at ground level.

Northbound collector-distributor road traffic travels on flyover over the Gympie Arterial Road, arcs to the left and then joins/merges to run adjacent to the Bruce Highway, northbound.

Label: Potential fauna overpass

Label: To Gympie Arterial Road

Label: Bruce Highway

02:30

Southbound collector-distributor roads are depicted on the right of screen, with exiting traffic joining the Gateway Motorway, curving to the right.

Southbound collector-distributor traffic exiting to Gympie Arterial Road travels on a flyover over the Bruce Highway corridor to merge with the Gympie Arterial Road.

Label: Southbound collector-distributor

02:37

Flythrough travels north along the widened Bruce Highway, extending over the Pine River.

Northbound and southbound collector-distributor roads are shown on either side of the Bruce Highway (northbound on left, southbound on right of highway corridor).

Additional bridges are shown over Pine River on either side of Bruce Highway to accommodate the CD roads.

Label: Northbound collector-distributor

02:40

A green highlighted line is shown on the right-hand side of the new southbound collector-distributor road, depicting the new shared pathway for pedestrians and bike riders extending north, adjacent to the Bruce Highway road corridor.

Label: Shared path over the Pine River (right hand side-East)

02:41-6           

Label: Potential fauna underpass, on northern side of the Pine River. To assist east-west fauna movements under the Bruce Highway corridor.

02:58

Flythrough continues north, depicting widened Bruce Highway and additional northbound/southbound collector-distributor roads on either side of the Bruce Highway corridor.

Label: Bruce Highway to Sunshine Coast

03:13

Northbound collector-distributor road exits to the left of screen to Dohles Rocks Road.

Label: Collector-distributor exits to Dohles Rocks Road

03:13

Southbound collector-distributor road from Dohles Rocks Road enters on the right of the screen.

Label: Dohles Rocks Road entry to collector-distributor.

03:27

Flythrough slows to hover at the Bruce Highway - Dohles Rocks Road interchange.

Dohles Rocks Road runs east-west under the Bruce Highway corridor.

03:28

Flythrough stops moving - looking north:

Label identifies the start of the Bruce Highway (Dohles Rocks Road to Anzac Avenue) Stage 1 project.

On left:

  • Label: New extended entry ramp
  • Orange line: depicts new entry ramp extending north on Bruce Highway from Dohles Rocks Road.

On right:

  • Label: New extended exit ramp
  • Orange line: depicts new exit ramp extending south from Bruce Highway to meet Dohles Rocks Road.

03:35

  • Music stops. Branding slides. Australian Government logo and Queensland Government logos.

Video ends.

Community consultation

Have your say

Community consultation for 2023 has closed.

The department would like to thank the community for providing feedback on the recommended planning for Gateway Motorway (Bracken Ridge to Pine River) and Bruce Highway (Gateway Motorway to Dohles Rocks Road).

TMR will continue to engage the community and provide further opportunities for feedback when planning progresses to design and construction. For more information, visit the consultation page.

Previous consultation

The community and key stakeholders provided their feedback during community consultation from October to December 2022.

This feedback was considered to inform the development of the three business cases. 

A summary of the feedback is available to view.

Community impacts

The department recognises these upgrades will create changes in the local areas and we are committed to minimising these as much as possible as planning progresses.

Property

Property impacts are expected from the upgrades, and we are engaging with impacted property owners. 

Environmental management

There will be impacts on some surrounding wetlands and park areas. We are working to minimise these impacts with local environmental and community groups wherever possible.

Noise 

Planning is considering potential changes to road traffic noise. This will include identifying possible noise treatment such as noise barriers.

Gateway Motorway and Bruce Highway upgrades location map

Map depicting area of Gateway Motorway and Bruce Highway Upgrades area.  Starts from Gateway Motorway at Bracken Ridge and extends north through to the interchange with Bruce Highway and Gympie Arterial Road, crossing the Pine River and on the Bruce Highway through the Dohles Rocks Road interchange then extending north to Anzac Avenue interchange. The map shows the project area extending south from Bruce Highway onto Gympie Arterial Road through to Strathpine Road.

Map depicting area of Gateway Motorway and Bruce Highway Upgrades area. Starts from Gateway Motorway at Bracken Ridge and extends north through to the interchange with Bruce Highway and Gympie Arterial Road, crossing the Pine River and on the Bruce Highway through the Dohles Rocks Road interchange then extending north to Anzac Avenue interchange. The map shows the project area extending south from Bruce Highway onto Gympie Arterial Road through to Strathpine Road.

52 Projects in Gateway Motorway and Bruce Highway upgrades

No image supplied

Barwon Highway (Talwood - Nindigully) Weengallon, pavement widening

Pavement widening on the Barwon Highway has been completed to improve road safety, reduce ongoing maintenance demand and provide a better driving experience for road users in the area.

Photograph of the Beaudesert-Nerang Road and Tabragalba House Road intersection

Beaudesert to Beenleigh corridor safety improvements

The department has delivered safety improvements on sections of the Beaudesert to Beenleigh corridor.

The map shows the locality of the proposed Beaudesert-Nerang Road, Yalkuri Drive and Willawong Crescent intersection upgrade. Beaudesert is located to the west and Nerang to the east of the project location. A solid dark blue line indicates the project extent, which encompasses Yalkuri Drive south of the intersection and Willawong Crescent north of the intersection, as well as Beaudesert–Nerang Road, which is located west and east of the intersection. The local road network, Riverlea Waters Drive is also highlighted on the map.

Beaudesert – Nerang Road and Yalkuri Drive, upgrade intersection

Beaudesert – Nerang Road, Yalkuri Drive and Willawong Crescent intersection has been upgraded with traffic signals to improve safety and operational functionality. This also includes on-road designated and shared bicycle infrastructure.

No image supplied

Bruce Highway (Brisbane - Gympie), Caboolture - Bribie Island Road to Steve Irwin Way upgrade

Major construction was completed for the Bruce Highway Upgrade — Caboolture-Bribie Island Road to Steve Irwin Way project in April 2024. This project widened the 11km stretch of the Bruce Highway from 4 to 6 lanes between Caboolture-Bribie Island Road and Steve Irwin Way (Exit 163). This also included upgrading creek crossings to improve flood immunity at Lagoon, King Johns, Six Mile, Un-named and Beerburrum Creeks.

Aerial view of road, trees, cars and houses

Bruce Highway (Brisbane - Gympie), Gateway Motorway to Dohles Rocks Road upgrade (Stage 1)

The Bruce Highway - Gateway Motorway to Dohles Rocks Road (Stage 1) project is part of integrated planning for the Gateway Motorway and Bruce Highway Upgrades in north Brisbane and the Moreton Bay Region.

No image supplied

Bruce Highway (Brisbane - Gympie), Gateway Motorway to Dohles Rocks Road upgrade (Stage 2), detailed design

The Bruce Highway - Gateway Motorway to Dohles Rocks Road (Stage 2) project is part of integrated planning for the Gateway Motorway and Bruce Highway Upgrades in north Brisbane and the Moreton Bay Region.

Artist’s impression of the extended north-facing ramps at Dohles Rocks Road interchange on the Bruce Highway, looking north.

Bruce Highway (Brisbane-Gympie), Dohles Rocks Road to Anzac Avenue upgrade (Stage 1)

The department is delivering staged upgrades to manage increasing traffic demands on this section of the Bruce Highway. Stage 1 includes extended north-facing ramps from Dohles Rocks Road to Anzac Avenue.

No image supplied

Bruce Highway (Ingham – Innisfail), Smiths Gap, construct southbound overtaking lane and fauna overpass

The department has built a southbound overtaking lane and fauna crossing at Smiths Gap on the Bruce Highway.

No image supplied

Bruce Highway (Mackay - Proserpine), Jumper Creek, upgrade flood immunity

Upgrades to improve flood immunity at Jumper Creek, between Mackay and Proserpine are now complete.

No image supplied

Bruce Highway (Mackay – Proserpine), Goorganga Plains, plan and preserve

The Bruce Highway upgrade project at Goorganga Plains and Myrtle Creek, near Proserpine, aims to plan and preserve the road corridor to enhance flood immunity and address access issues during wet weather events. 

No image supplied

Bruce Highway (Proserpine - Bowen), Emu Creek to Drays Road, various locations, widen formation

Safety upgrades have been completed to almost 20km of the Bruce Highway from Proserpine to Bowen, as part of the Bruce Highway Upgrade Program.

No image supplied

Bruce Highway Planning Project—Pine River to Caloundra Road 

The department has delivered a planning project to investigate and prioritise upgrades to the Bruce Highway between the Pine River and Caloundra Road.

John Davies Bridge, Bruce Highway, between Edmonton to Gordonvale

Bruce Highway, Cairns Southern Access Corridor (Stage 3), Edmonton to Gordonvale

A total transport solution has been delivered to provide long-term improvements to traffic flow and road safety through reducing congestion, highway travel time and improving road access.

No image supplied

Bulimba Peninsula Transport and Congestion Study

The Bulimba Peninsula Transport and Congestion Study identified community priorities to improve transport options and outcomes for the Bulimba Peninsula.

No image supplied

Bundaberg Port Rail Link Study

In October 2007 Transport and Main Roads (then Queensland Transport) engaged GHD to undertake a study to identify a rail corridor (for freight traffic) to connect the Port of Bundaberg to the existing rail network via the North Coast line. The study report determined that protection of the corridor within the local government planning scheme was not warranted at the time, and the project was closed.

No image supplied

Cairns to Northern Tablelands Access Strategy

The department has completed a comprehensive planning study into the 4 transport corridors linking Cairns to the Northern Tablelands.

Capricorn Highway (Emerald - Alpha), widen pavement project map

Capricorn Highway (Emerald - Alpha), widen pavement

3 high priority sections of the Capricorn Highway between Emerald and Alpha have been widened.

Thumbnail image of artist impression of overpass

Clontarf - Anzac Avenue (Elizabeth Avenue), construct active transport overpass

A pedestrian overpass over Elizabeth Avenue was installed to provide a safe crossing facility between Clontarf Beach State High School's main campus and Department of Education fields across the road.

No image supplied

Clump Point Mission Beach boating infrastructure project

Works were undertaken to upgrade the public boating facilities at Mission Beach Clump Point.

Coomera train station, upgrade park 'n' ride

We have upgraded the park 'n' ride facilities at the Coomera train station.

The map shows the location of rehabilitation and widening works underway on a three kilometre section of the Cramsie-Muttaburra Road. The road is situated between Longreach and Muttaburra in Central West Queensland. The map shows the proximity of the works to the Longreach township and includes the surrounding road network, such as the Landsborough Highway and local government-owned Longreach-Muttaburra Road.

Cramsie-Muttaburra Road, rehabilitate and widen pavement

A 3km section of aged, narrow pavement on the Cramsie-Muttaburra Road has been rehabilitated and widened, providing improved overtaking opportunities.

Image showing construction on the new overpass at Eight Mile intersection in March 2022.

Cunningham Highway (Ipswich - Warwick), Eight Mile intersection upgrade

A major intersection upgrade to improve safety at the Cunningham and New England highways intersection is complete.

Eton Range

Eton Range Realignment Project

Eton Range fully opened to traffic on 1 October 2020. The existing range has been upgraded to 4 lanes, added a split carriageway for part of the range and reduced the grade to improve safety and efficiency.

No image supplied

Eyre Developmental Road (Bedourie - Birdsville), pave and seal

Works have been completed to seal around 35km of the 185km road, improving safety, connectivity and wet weather access.

Scrubby Creek looking west pre-construction

Flinders Highway (Julia Creek – Cloncurry), Scrubby Creek, pavement, strengthening and widening of floodway

The department has delivered 9km of pavement strengthening and widening of the floodway along the Flinders Highway between Julia Creek and Cloncurry at Scrubby Creek.  

Aerial view of roads, cars, trees and houses

Gateway Motorway, Bracken Ridge to Pine River upgrade

The Gateway Motorway (Bracken Ridge to Pine River) project is part of integrated planning for the Gateway Motorway and Bruce Highway Upgrades in north Brisbane and the Moreton Bay Region.

No image supplied

Kennedy Developmental Road—(The Lynd-Hughenden) upgrade

The department has delivered 48km of new sealing along the Kennedy Developmental Road between The Lynd to Hughenden.

Kennedy Highway (Cairns - Mareeba), Kuranda Range, Intelligent Transport System

Intelligent Transport Systems (ITS) treatments on Kuranda Range Road have been installed. The Intelligent Transport System treatments will make it quicker and easier to manage incidents and reduce the risk of crashes.

No image supplied

Kin Kin Road—Six Mile Creek: replace timber bridge

The Six Mile Creek timber bridge on Kin Kin Road, 3km north of Pomona, has been replaced with a concrete bridge structure.

No image supplied

Maroochydore - Mooloolaba Road and Ocean Street, improve intersection

Construction is complete for safer pedestrian crossings in Maroochydore's entertainment precinct.

Murphys Creek Road ROcky Creek Bridge replacement project location map.

Murphys Creek Road, Rocky Creek Bridge, replace bridge

Rocky Creek Bridge was replaced to improve safety, traffic flow, flood immunity and efficiency.

Map of project location on the New England Highway (Ruthven Street) between James Street and Nelson Street in Toowoomba

New England Highway (Toowoomba - Warwick), high risk roads, improve safety

Construction is complete to improve safety on Ruthven Street in Toowoomba's south.

No image supplied

New England Highway (Toowoomba-Warwick) Hodgson Creek to Cambooya Connection Road – options analysis

This planning project involved investigating ways to improve safety and efficiency on the New England Highway between Hodgson Creek and the southern side of Cambooya Connection Road.

The map shows the locality of works completed to improve safety on the New England Highway between Stanthorpe and Ballandean. Solid dark blue lines indicate eight packages of work. Places included on the map from north to south include Stanthorpe, Glen Aplin and Ballandean. The maps also indicates the location of select roads that intersect with New England Highway including Texas Road, Wallangarra Road, Back Creek Road, Kerridges Road, Glen Aplin Drive, Sutton Lane, Fletcher Road and Eukey Road.

New England Highway (Warwick - Wallangarra), high risk roads, improve safety

The department has delivered pavement widening and resurfacing works to improve safety and freight efficiency on the New England Highway between Stanthorpe and Ballandean.

New England Highway Cooyar to Bum Bum Creek

New England Highway—(Yarraman-Toowoomba), widen pavement

The upgrade of the New England Highway between Cooyar and Bum Bum Creek has been completed, delivering critical safety and efficiency improvements south of Yarraman.

Northgate station park 'n' ride business case

The department has completed planning which investigated expansion of parking facilities at Northgate station in response to high demand for parking in the local area.

No image supplied

Ormeau station park 'n' ride upgrade

We have upgraded the car park at the Ormeau station park 'n' ride.

Aerial of Pacific Motorway looking southbound at Eight Mile Plains

Pacific Motorway Eight Mile Plains to Daisy Hill Upgrade (Sports Drive to Gateway Motorway Upgrade)

The Sports Drive to Gateway Motorway Upgrade is part of a rolling program of upgrades between the Gateway and Logan Motorways.

No image supplied

Pacific Motorway Exit 45 southbound off-ramp, upgrade interchange

Safety improvements to the Ormeau Interchange (Exit 45) southbound off-ramp on the Pacific Motorway has reduced traffic on the M1 and Lahrs Road.

Pacific Motorway M1 Mudgeeraba to Varsity Lakes upgrade Mudgeeraba Creek bridges

Pacific Motorway M1 Mudgeeraba to Varsity Lakes upgrade

We have delivered an upgrade of the M1 between Mudgeeraba and Varsity Lakes to reduce travel time and congestion, improve safety, and increase traffic flow. Interchange enhancements have improved access on and off the motorway.

M1 M3 Gateway merge

Pacific Motorway Upgrade M1 M3 Gateway merge

Construction to upgrade the M1/M3 Gateway merge to improve safety and reduce peak hour congestion was completed in May 2020.

Aerial photo of Pacific Highway early works location

Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade (Pacific Highway early works upgrade)

The Pacific Highway (western service road) in Slacks Creek was realigned and upgraded as part of the Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade.

No image supplied

Pacific Motorway, Exit 41, upgrade interchange

The Yatala South (Exit 41) interchange upgrade on the Pacific Motorway (M1) has resulted in significant enhancements to safety and traffic flow in the area.

The map shows the locality of three separate projects on the Richmond-Winton Road delivered as part of a progressive approach to sealing this road. The road is located between Richmond and Winton in western Queensland, with the three projects closest to Winton. Project location 1 is shown by a solid blue line. Project location 2 is shown by a green line with a broken blue line in the centre. Project location 3 is shown by an orange line with a blue line in the centre. The surrounding road network, including the Landsborough Highway and local government owned Corfield-Richmond Road are also shown on the map.

Richmond-Winton Road, pave and seal

Another 3km of the road has been sealed to improve safety and travel times on this key transport link.

No image supplied

Rockhampton — Emu Park Road, upgrades including overtaking lanes and other priority safety and capacity improvements

This project upgraded about 4km of Rockhampton-Emu Park Road to improve safety for all road users.

No image supplied

South Brisbane Transport and Mobility Study

We conducted a multi-modal study of the ongoing and increasing transport pressures relating to road, active transport and public transport modes in Brisbane’s inner south.

No image supplied

Southern Freight Rail Corridor Study

The Southern Freight Rail Corridor has been identified as a future route connecting the Western Rail line near Rosewood to the interstate railway north of Beaudesert. The Southern Freight Rail Corridor will serve as a major freight link connecting a future Melbourne to Brisbane Inland Rail line with the existing south-east Queensland rail freight network.

No image supplied

Strathpine Shopping Centre bus station, upgrade

Construction is complete for the upgrade of the Strathpine Shopping Centre bus station.

Hervey Range Developmental Road interchange (looking north), photo shows two overpasses and traffic traveling across the overpasses and underneath

Townsville Ring Road (Stage 5)

The Townsville Ring Road Stage 5 project, a landmark initiative that has brought about substantial improvements in road safety, traffic flow and travel time predictability for both freight and passenger vehicles along the Bruce Highway in Townsville, has been completed.

Image of Warwick principal cycle network plan, business case locations. Cunningham Highway and Dragon Street intersection, and the New England Highway and Pratten Street intersection.  Dragon, Pratten and Easey streets.

Warwick principal cycle network plan, business case

This project is part of a state-wide strategy to help improve bicycle riding facilities and networks in Warwick to increase active transport.