Logan and Gold Coast Faster Rail

We're connecting our growing communities with more frequent and reliable train services between Brisbane, Logan and the Gold Coast.

South East Queensland (SEQ) has experienced significant growth over the last 2 decades. This growth is expected to continue with an extra 1.5 million people living in the region by 2036. To harness this growth and support our region's thriving communities we must keep evolving the rail network so that it plays a bigger role in moving people around SEQ.

To support our growing population and rail patronage demand between Brisbane, Logan and the Gold Coast, we need to double the number of Beenleigh and Gold Coast train services over the next 20 years.

The rail line between Kuraby and Beenleigh is a key capacity bottleneck on the network. Currently, trains between Kuraby and Beenleigh share a single track in each direction, limiting the number of peak services that can run. During peak periods, all-stop Beenleigh trains need to be held to one side to allow Gold Coast express trains to pass through. 

The Logan and Gold Coast Faster Rail project will address this problem by doubling the number of tracks between Kuraby and Beenleigh to allow the free movement of both all-stops and express trains. The project will also upgrade stations to improve accessibility, remove 5 level crossings, improve park ‘n’ ride facilities and provide a new continuous active travel path connecting to stations along the 20km section of upgraded tracks.

Key features

Logan and Gold Coast Faster Rail will deliver:

  • double the capacity of the Gold Coast rail line and reduce waiting times at stations between Brisbane, Logan and the Gold Coast
  • approximately 20km of new tracks and rail systems between Kuraby station and Beenleigh station, increasing the corridor from 2 to 4 tracks
  • better connected communities through accessible upgrades at stations and dedicated active transport facilities and paths along the corridor 
  • improved road network efficiency and reduced peak hour traffic congestion through intersection upgrades and level crossing removals at Kuraby, Woodridge, Bethania, Holmview, and Beenleigh
  • new train signalling technology between Salisbury and Varsity Lakes
  • extension of the cattle siding at Holmview.

Logan and Gold Coast Faster Rail flythrough video

Video Transcript
0:00:00.600-->0:00:03.712
The words Logan and Gold Coast Faster Rail appear on the screen, over a map of South East Queensland.

0:00:04.000-->0:00:10.640
Orange markers identify Kuraby station and Beenleigh station on the map.

0:00:10.640-->0:00:14.320
A dark blue line traces the existing rail line and the location of the Logan and Gold Coast Faster Rail project corridor.

0:00:14.320-->0:00:17.607
A light blue line extends north and south showing the Gold Coast rail line and Cross River Rail project.

0:00:17.607-->0:00:27.050
Green boxes then appear which show the location of Brisbane, Logan, and the Gold Coast in relation to the project.

0:00:27.417-->0:00:36.417
An aerial map appears with a line travelling south along the existing rail line.

0:00:39.000-->0:00:45.000
A marker for Kuraby station appears and green shading shows the project footprint along the rail line.

0:00:45.000-->0:00:48.000
Markers on the map pick out nearby Kuraby State School, Wally Tate Park, the Gateway Motorway, Beenleigh Road Park and Beenleigh Road.

0:00:48.000-->0:00:52.000
A concept design for Kuraby station, which is modern and coloured white and beige. There are covered areas for shade.

0:00:52.000-->0:00:54.000
The building is supported by V shaped pillars and there is a lift and steps to the platform.

0:00:55.000-->0:00:59.000
A marker for Trinder Park station appears on an aerial map showing the local area.

0:00:59.000-->0:01:01.520
Green shading highlights the project footprint in the surrounding area

0:01:01.520-->0:01:04.520
and markers showing the nearby park ‘n’ ride, road over rail bridge and level crossing closure at Trinder Crossing.

0:01:04.520-->0:01:06.520
Markers show Woodridge North State School, Logan Metro Football Club, Karawatha Forest Discovery Centre and Trinder Park current station in relation to the project.

0:01:06.520-->0:01:09.640
A concept design for Trinder Park station, which is modern and coloured white and beige. There is a covered area to the right.

0:01:09.640-->0:01:12.060
The roof is supported by V shaped pillars with steps to the platform.

0:01:12.060-->0:01:15.000
A marker for Woodridge station appears on an aerial map showing the local area.

0:01:15.000-->0:01:19.295
Green shading highlights the project footprint in the surrounding area and the new park ‘n’ ride.

0:01:19.295-->0:01:23.379
Markers show the location of Railway Parade, Wembley Road, Woodridge State School,

0:01:23.379-->0:01:26.052
Logan City Council and Jacaranda Avenue in relation to the project footprint.

0:01:26.052-->0:01:30.800
A concept design for the new widened underpass at Woodridge station which is light, bright, and modern.

0:01:30.920-->0:01:35.799
A marker for Kingston station appears on an aerial map showing the local area.

0:01:35.799-->0:01:38.947
Green shading now shows the project footprint around the station.

0:01:38.947-->0:01:41.924
Markers show nearby Collin Park, Kingston Road, Mary Street, Kingston Butter Factory and Gould Adams Park

0:01:42.000-->0:01:45.289
A concept design for Kingston station, which is modern and coloured white and beige. There is a covered area to the right.

0:01:45.289-->0:01:47.080
The roof is supported by V shaped pillars with steps to the platform.

0:01:47.080-->0:01:50.080
A marker for Loganlea station appears on an aerial map showing the local area.

0:01:50.080-->0:01:52.080
Green shading shows the project footprint around the station.

0:01:52.080-->0:01:59.828
Markers show nearby Meadowbrook Shopping Centre, Loganlea current station, Logan Hospital, TAFE Qld Loganlea campus and Loganlea High School

0:01:59.828-->0:02:02.480
A concept design for the new Loganlea station which is modern and coloured grey and beige. There are covered areas for shade.

0:02:02.480-->0:02:05.000
The building is supported by vertical pillars with steps to the platform.

0:02:05.000-->0:02:07.000
A marker for Bethania station appears on an aerial map showing the local area.

0:02:07.000-->0:02:12.000
Green shading shows the project footprint around the station and the new park ‘n’ ride.

0:02:12.000-->0:02:17.480
Markers show nearby Bethania Aquatic Centre, Bethania Waters Shopping Centre, Station Road, Holzheimer Road and Bethania Lutheran Church.

0:02:17.480-->0:02:21.480
A concept design for the new Bethania station which is modern and coloured white and beige. There are covered areas to the right.

0:02:21.480-->0:02:23.240
The roof is supported by V shaped pillars with steps to the platform.

0:02:23.240-->0:02:27.240
A marker for Edens Landing station appears on an aerial map showing the local area.

0:02:27.240-->0:02:30.000
Green shading shows the project footprint.

0:02:30.000-->0:02:34.802
Markers show nearby Edens Landing Shopping Centre, Logan City Hawks Rugby Leagues Club and Edens Parkland.

0:02:34.802-->0:02:38.588
A concept design for the new Edens Landing station which is modern and coloured white and beige. There are covered areas for shade.

0:02:38.588-->0:02:40.680
The building is supported by V shaped pillars with steps to the platform.

0:02:40.680-->0:02:44.880
A marker for Holmview station appears on an aerial map showing the local area.

0:02:44.880-->0:02:47.880
Green shading shows the project footprint including the level crossing closure at Holmview

0:02:47.880-->0:02:50.880
road, the new park ‘n’ ride and the level crossing closure at Spanns Road.

0:02:50.880-->0:02:53.880
Markers show nearby Holmview Park, Holmview Road, the current Holmview station and Spanns Road level crossing.

0:02:53.880-->0:02:56.772
A concept design for the new Holmview station which is modern and coloured white and beige. There are covered areas for shade.

0:02:56.772-->0:02:58.760
The building is supported by V shaped pillars with steps to the platform.

0:02:58.760-->0:03:02.000
A marker for Beenleigh station appears on an aerial map showing the local area.

0:03:02.000-->0:03:04.000
Green shading shows the project footprint including the park ‘n’ ride.

0:03:04.000-->0:03:06.000
Markers show nearby Hammel Park Sporting Facilities, James Street, Beenleigh State School, Beenleigh Library,

0:03:06.000-->0:03:08.000
Beenleigh Town Square, George Street, the current Beenleigh station and the Beenleigh Marketplace.

0:03:13.400-->0:03:15.400
A concept design for the new Beenleigh station which is modern and coloured white and beige. There are covered areas for shade and a multi-story carpark.

0:03:15.400-->0:03:18.400
The building is supported by V shaped pillars. Lifts and stairs lead to the platforms.

0:03:18.400-->0:03:24.400
An aerial map shows the route of the rail line and stations included in the project.

0:03:24.400-->0:03:28.400
The words Logan and Gold Coast Faster Rail appear on the screen along with the Australian Government logo and the Queensland Government logo.
 

Benefits

  • Improves network efficiency
  • Improves safety
  • Better road access
  • Reduces travel time
  • Contributes to regional growth
  • Increases capacity
  • Reduces peak hour congestion
  • Increases car parks
  • Contributes to economy
  • Better active transport

Funding

The Australian Government and Queensland Government are funding the project. Investment ID 2008163.

Funding figures updated December 2023 to reflect increased Australian Government and Queensland Government contributions.

Total investment
$5.75 billion
Australian Government
$2.875 billion
Queensland Government
$2.875 billion

Current status

In late 2023, we completed community engagement on the refined reference design for the project, as well as the detailed design for the Loganlea Station Relocation project.

The Contractor procurement process is progressing and in March 2024 we shortlisted parties to tender for the delivery of three packages of work:

Logan and Gold Coast Rail Package – will deliver the major rail works between Kuraby and Beenleigh including doubling the number tracks from two to four, station upgrades, three level crossing removals (at Woodridge, Holmview and Beenleigh), local road works and active transport connections.

Logan and Gold Coast Open Level Crossing Removals Package – will remove two level crossings at Beenleigh Road, Kuraby and Station Road, Bethania and replace with new road-over-rail bridges, improving safety and journey times for road and rail users.

Loganlea Station Relocation Project – will upgrade and relocate Loganlea station to better connect customers with nearby education, community and health services – particularly Logan Hospital.

We expect to award contracts in late 2024, subject to government approvals.

Construction timeframes will be confirmed once contractors have been appointed.

Field investigations

You might notice some field investigations being conducted at selected sites throughout the corridor. This information will help us understand more about the existing conditions and environment along the rail corridor.

If we need access to private property, we will contact the owners in advance to make suitable arrangements.

Project timeline

  • September to October 2021: Community engagement on business case
  • 2022–2023: Further refinement of the reference design
  • August 2023: Procurement activities started
  • November to December 2023: Community engagement on refined reference design
  • March 2024: Potential contractors shortlisted
  • Late 2024: Expected contract awarded
  • 2025: Expected start of construction

Additional information

Information for property owners

Property owners who have been informed they are directly impacted by this project may be eligible to apply for a strategic purchase of their property. A strategic purchase allows owners to voluntarily apply to sell their property to the department before the formal resumption process.

While there is no difference between the compensation assessment process of a strategic purchase and compulsory acquisition, a strategic purchase can provide property owners with more flexibility in the timing of the sale.

If you have been advised that your property is directly impacted by the project, you may be eligible to apply for a strategic purchase. Contact the project team to understand your eligibility and to apply.

We want to ensure that people interested in buying property in the area are also aware of the project. A Transport and Main Roads property search will show if there is a property requirement for the land. Potential owners can contact the project team with any questions.

Information for local business owners

We've been visiting local businesses along the project corridor to provide an update on the project and to gather information and feedback to inform future planning. 

Local business owners are encouraged to register their details with us by contacting the project team on 1800 957 066 or by emailing LGC.Business@tmr.qld.gov.au.

Logan and Gold Coast Faster Rail location map

Map details the train line from Beenleigh to Kuraby
The project is located along the rail corridor from Kuraby station to Beenleigh station. In the background both the road network and the Logan River are shown. The map identifies the alignment of the tracks and shows stations including (from north to south) Kuraby, Trinder Park, Woodridge, Kingston, Loganlea, Bethania, Edens Landing, Holmview and Beenleigh. The track alignment shows the curved section of track at the existing Trinder Park station location and where the new section of straightened track will run in its place. The map also shows the locations of five level crossings that will be removed as part of the project. These are located at Kuraby, Woodridge, Bethania and Holmview station in Beenleigh.

88 Projects in Logan and Gold Coast Faster Rail

Burdekin River Bridge

Burdekin River Bridge, rehabilitation program

The department is undertaking the rehabilitation and maintenance program for the Burdekin River Bridge to preserve the structural integrity of the bridge. The ongoing program will ensure a safe and durable crossing is maintained for the long-term use of vehicles, heavy transport operators, rail operations, bicycle riders and pedestrians.

No image supplied

Barcaldine-Aramac Road, rehabilitate and widen pavement

The Barcaldine-Aramac Road is undergoing upgrades with an additional 5km being widened to improve travel conditions.

No image supplied

Beams Road (Carseldine and Fitzgibbon), upgrade rail level crossing

The Beams Road rail level crossing project will reduce congestion and address safety concerns. The current rail level crossing on Beams Road will be replaced with an overpass to separate road and rail.

Artist impression of Beenleigh Train station showing carpark, pedestrian overpass and lift and stair access.

Beenleigh train station upgrade

Beenleigh train station is a key transfer location between all-stops and express services on the Beenleigh and Gold Coast train lines.

Artist impression of the Bethania train station from street view.

Bethania train station upgrade

Bethania train station is being upgraded to improve accessibility, safety and customer experience. 

Brisbane Valley Highway (Ipswich - Harlin), Warrego Highway to Fernvale, improve safety

Improvements to approximately 14km of the Brisbane Valley Highway will reduce the rate and severity of crashes and improve traffic efficiency.

No image supplied

Bruce Highway (Bowen-Ayr), Inkerman overtaking lane and safety improvement projects

Safety on the Bruce Highway at Inkerman will be improved through the installation of new northbound overtaking opportunity and upgrades to the Mount Inkerman Road intersection.

Artist’s impression of the extended north-facing ramps at Dohles Rocks Road interchange on the Bruce Highway, looking north.

Bruce Highway (Brisbane-Gympie), Dohles Rocks Road to Anzac Avenue upgrade (Stage 1)

The department is delivering staged upgrades to manage increasing traffic demands on this section of the Bruce Highway. Stage 1 includes extended north-facing ramps from Dohles Rocks Road to Anzac Avenue.

Looking north towards an 8 span, 260 metre long concrete bridge structure over Deep Creek with construction crews on the bridge completing the final layer of pavement in preparation for linemarking. There is a bio-retention basin (like a sediment pond) in the foreground.

Bruce Highway (Cooroy to Curra) Section D

The $1.162 billion Section D: Woondum to Curra project is a new 26km, 4-lane divided highway between the existing Bruce Highway interchange at Woondum, south of Gympie and Curra.

No image supplied

Bruce Highway (Innisfail – Cairns) and Munro street (Babinda) intersection upgrade

The department is progressing a project to upgrade the intersection of the Bruce Highway and Munro Street at Babinda.

No image supplied

Bruce Highway (Mackay – Proserpine), Knobels Road, upgrade intersection and approaches

Construction has started at the Knobels Road and Nebia Coningsby Road intersection to improve safety and enhance visibility.

No image supplied

Bruce Highway (Townsville to Ingham) safety improvements and rest area upgrade projects

Bruce Highway works, between Townsville and Ingham, are underway to improve safety and upgrade a rest area.

Project location map of Leichhardt Creek to Abergowrie Road construction area to widen pavement.

Bruce Highway (Townsville-Ingham), Leichhardt Creek to Abergowrie Road, widen pavement and improve safety

Bruce Highway upgrades between Leichhardt Creek and Cassowary Creek (about 42km north of Townsville).

No image supplied

Bruce Highway – Pine River to Caloundra Road Smart Motorways (Stage 2)

The Bruce Highway - Pine River to Caloundra Road Smart Motorways (Stage 2) project will deliver additional Smart Motorways technology along a 60km section of the Bruce Highway between the Pine River and Caloundra Road.

No image supplied

Caboolture - Beachmere Road, improve safety

Construction is underway to implement safety improvements for Caboolture – Beachmere Road (locally known as Beachmere Road) and enhance overall driving conditions.

No image supplied

Cairns Bruce Highway Upgrade master plan

The Cairns Bruce Highway Upgrade master plan was released in 2010. It was the result of a planning study that investigated long term, multi-modal transport planning options to address the impacts of urban growth, congestion and traffic accidents.

Cairns Southern Access Cycleway

Cairns Southern Access Cycleway, construct cycleway

The Department is reinvesting project savings to deliver a new off-road cycleway next to the Bruce Highway, consistent with the Cairns Bruce Highway Upgrade Masterplan. The project will deliver a safe off-road facility for bicycle riders of all abilities, including school children and the active transport community. The new cycleway also delivers a direct and continuous route with limited intersections to encourage bicycle riders to use the off-road facility.

No image supplied

Cape York Region Package Stage 2

The Cape York Region Package Stage 2 is a program of works to deliver infrastructure upgrades on the Cape York Peninsula between 2019-2020 and 2023-2024.

No image supplied

Capricorn Highway (Duaringa–Emerald), undertake road safety improvements

The Capricorn Highway is a key freight route and supports a wide range of industries including agriculture, resources and mining. It plays an important role in connecting Rockhampton with central and western communities in Queensland.

Carnarvon Highway Injune Rolleston Dawson River bridge upgrade

Carnarvon Highway (Injune - Rolleston), Dawson River bridge upgrade

The Carnarvon Highway (Injune - Rolleston), Dawson River bridge upgrade project will improve safety and network efficiencies by realigning the approaches and widening the existing structure.

Carnarvon Highway Mungindi St George project map

Carnarvon Highway (Mungindi – St George), widen and seal

Works will involve pavement widening and sealing of various sections of the Carnarvon Highway between 85.16km and 87.44km east of St George.

No image supplied

Castlereagh Highway (St George–Hebel) flood immunity improvements and pavement resilience

The department is improving the flood immunity and resilience of the Castlereagh Highway near Dirranbandi.

Centenary Bridge Jindalee artist impression Sept 2020

Centenary Bridge Upgrade

The Centenary Bridge Upgrade in Jindalee will increase capacity and improve safety on the Centenary Bridge by building a new 3-lane northbound bridge and rehabilitating the existing bridges to 3 lanes southbound including upgrades to active transport facilities.

No image supplied

Cleveland-Redland Bay Road upgrade

The department is undertaking a $110 million package of works to upgrade Cleveland-Redland Bay Road.

Artist's impression of a road crossing a river

Coomera Connector (Stage 1)

The Stage 1 section of the Coomera Connector between Coomera and Nerang has been identified as the priority section to be built first.

No image supplied

Coomera Connector Stage 1 North

Coomera Connector (Stage 1) is around 16km and will be delivered in 3 construction packages. Stage 1 North, which is currently under construction, is the 4km section from Shipper Drive to Helensvale Road.

Aerial image of Cunningham Highway at Cunninghams Gap

Cunningham Highway (Ipswich – Warwick), 2020 Disaster Recovery Funding Arrangements reconstruction works

The department is committed to restoring and repairing the damaged section of the Cunningham Highway at Cunninghams Gap. This 2km stretch, leading up to the Allan Cunningham monument, suffered significant road damage during the bushfires in 2019.

No image supplied

D'Aguilar Highway (Yarraman – Kingaroy), various locations, improve safety

Construction and design works are underway for upgrades at various locations as part of a program of works to improve the D'Aguilar Highway between Yarraman and Kingaroy.

No image supplied

Diamantina Developmental Road (Quilpie – Windorah), widen and seal

Works involve widening to 8m and sealing a 4.7km section of the Diamantina Developmental Road (Quilpie – Windorah).

Douglas Garbutt Road - Safe Roads Projects in Townsville

Douglas – Garbutt Road (Townsville), various locations (Stage 1), improve intersections

Safety upgrades will be carried out at various locations along Douglas – Garbutt Road.

Eastern Transitway

Eastern Transitway (Stage 1), bus priority works

The Eastern Transitway will provide bus customers in Brisbane's east with a safer and more efficient public transport network. The project will deliver targeted bus priority measures to improve safety, reliability, and capacity along Old Cleveland Road from Coorparoo to Carindale.

Artist impression of Edens Landing train station from street view showing the street level access with pedestrian bridge.

Edens Landing train station upgrade

Edens Landing station is being upgraded to improve accessibility, safety and customer experience.

No image supplied

Eumundi-Noosa Road, Emu Mountain Road to Beckmans Road, safety improvements

Construction is underway for safety improvements on Eumundi—Noosa Road for all road users, including bike riders.

Flood resilience works

The department is improving the flood immunity and resilience of the state-controlled road network at 27 priority sites.

No image supplied

Gatton-Helidon Road, pavement widening

Traffic flow and safety are being improved on Gatton-Helidon Road.

No image supplied

Glass House Mountains Road (Steve Irwin Way) safety improvements, between Glass House Mountains and Beerwah

This project will improve safety at various locations along Glass House Mountains Road (locally known as Steve Irwin Way) between Glass House Mountains and Beerwah.

Gold Coast Light Rail Tram with 'Burleigh' destination

Gold Coast Light Rail (Stage 3) Broadbeach South to Burleigh Heads, construct light rail

Gold Coast Light Rail is a world class public transport system for residents and visitors to the Gold Coast.

Aerial view of Gold Coast-Springbrook Road major slip site

Gold Coast-Springbrook Road, Disaster Recovery Funding Arrangements reconstruction works

Gold Coast-Springbrook sustained a significant number of landslips, rock falls and tree falls over a 10-kilometre section during extreme rainfall and flooding events from 22 February to 20 May 2022.

No image supplied

Gore Highway (Millmerran – Goondiwindi), Wyaga Creek, upgrade floodway

A new bridge at Wyaga Creek crossing on the Gore Highway will improve flood immunity, safety and efficiency on one of Queensland's most important transport links.

No image supplied

Gore Highway (Pittsworth - Millmerran), various locations, rehabilitate pavement

This project has trialled sustainable pavement systems and products to rehabilitate deteriorating sections of the Gore Highway.

No image supplied

Gregory Developmental Road (Charters Towers - Lynd), package of works

The package of Gregory Developmental Road upgrades is delivering a stronger and wider surface, improving travelling conditions for motorists and upgraded a major culvert to improve flood resilience.

No image supplied

Gulf Developmental Road (Croydon - Mount Garnet), strengthen and widen pavement

The Gulf Developmental Road is the principal freight and tourism route connecting Carpentaria Shire via the Kennedy Highway, with the Bruce Highway coastal link. The road is sealed, however there are 19 sections spread over 47kms that are only single lane.

No image supplied

Gympie Arterial Road (Bald Hills), replace and improve noise barriers

The department is replacing a section of noise barriers on the western side of Gympie Arterial Road, north of Strathpine Road in Bald Hills.

Artist impression of the Holmview train station from street view looking at the new station entrance.

Holmview train station upgrade

Holmview train station is being upgraded to improve accessibility, safety and customer experience.

No image supplied

Isis Highway (Bundaberg – Childers), various locations, improve safety

The department will improve safety on a 40km stretch of the Isis Highway from Airport Drive to the Bruce Highway.

No image supplied

Kin Kin Road - widening upgrade at Kin Kin range

Design and construction to rehabilitate and widen priority sections of Kin Kin Road (locally known as Pomona Kin Kin Road) is underway. This will improve safety, reduce maintenance costs and improve ride quality on Kin Kin Road.

No image supplied

Kin Kin Road Engineering Review

We've completed extensive investigations on our operational management of Kin Kin Road in response to community concerns around heavy vehicle traffic.

Artist impression of the Kingston train station entrance at street level.

Kingston train station upgrade

Kingston train station is being upgraded to improve accessibility, safety and customer experience for the community. 

Artist impression of how the upgraded Kuraby train station will look. The image shows the the new Kuraby entrance from street view with a train pulled into the station.

Kuraby train station upgrade

Kuraby station is being upgraded to improve accessibility, safety and customer experience for the community. 

No image supplied

Labrador – Carrara Road, Gold Coast Highway to Napper Road, construct cycleway

Design is underway for a bikeway on Olsen Avenue between the Gold Coast Highway and Napper Road.

Aerial photograph of a major landslip on Lamington National Park Road

Lamington National Park Road, Disaster Recovery Funding Arrangements reconstruction works

The department is working on multiple locations along Lamington National Park Road which require pavement rehabilitation and permanent reconstruction work following record rainfall across south east Queensland since December 2020.

Artist impression of the proposed upgraded Loganlea station. Image is looking from Station Road and shows the new wider underpass with people out the front of the new station building and trains pulled up at the platforms.

Loganlea train station and park 'n' ride relocation

We are relocating Loganlea train station and the park 'n' ride closer to Logan Hospital.

Pioneer River construction Mackay Ring Road

Mackay Ring Road

An improved link has been delivered from the south to the northern suburbs reducing traffic through Mackay.

No image supplied

Maleny – Kenilworth Road (Cambroon), various locations, widen pavement

Construction has started on widening and sealing 2 sections of Maleny-Kenilworth Road in the Conondale and Cambroon areas to provide a sealed lane and shoulder in each direction.

No image supplied

Maroochydore-Noosa Road (Bradman Avenue), Diura Street and Denna Street, improve intersections

Construction is underway for safety improvements to the intersections of Bradman Avenue/Diura Street and Bradman Avenue/Denna Street, Maroochydore.

No image supplied

Monto – Mount Perry Road progressive sealing

The department is progressively upgrading and sealing the gravel sections of Monto - Mount Perry Road to improve road user safety and comfort, and reduce future maintenance requirements. 

No image supplied

Nerang-Murwillumbah Road, safety treatments

This project is focused on improving safety along various sections of this 36km road where there is a high crash history. 

North Ward Road, Townsville - Safer Roads Projects program in Townsville

North Ward Road (Townsville), various locations (Stage 1), improve intersections

Safety upgrades will be carried out at various locations along North Ward Road.

Northern Transitway final design map

Northern Transitway

The department is delivering targeted bus priority from Kedron to Chermside, improving the safety and capacity of this important link in Brisbane's northern public transport network.

Artist's impression of the Ormeau rail facility

Ormeau rail facility

A rail facility is being constructed on a 66ha site in the Gold Coast region.

An aerial view of the Pacific Motorway Eight Mile Plains to Daisy Hill upgrade project.

Pacific Motorway Eight Mile Plains to Daisy Hill Upgrade (Watland Street to Sports Drive Upgrade)

The Pacific Motorway (M1) between Watland Street and Sports Drive is being upgraded as part of a rolling program of upgrades between the Gateway and Logan Motorways.

Pacific Motorway M1 Burleigh to Palm Beach Nineteenth Avenue Exit 89 Tallebudgera interchange

Pacific Motorway M1 Burleigh to Palm Beach (Nineteenth Avenue)

The M1 between Burleigh and Palm Beach (Package B) is being upgraded as part of the Varsity Lakes to Tugun (VL2T) upgrade. Package B will include significant environmental features through this section of the upgrade.

Pacific Motorway M1 Palm Beach Nineteenth Avenue to Tugun Currumbin Creek bridge

Pacific Motorway M1 Palm Beach (Nineteenth Avenue) to Tugun

The Pacific Motorway (M1) is being upgraded between Palm Beach and Tugun (Package C) as part of the Varsity Lakes to Tugun (VL2T) upgrade.

Aerial view of M1 at Varsity Lakes and Tugun section

Pacific Motorway M1 Varsity Lakes to Tugun upgrade

The $1.5 billion Pacific Motorway Varsity Lakes to Tugun (VL2T) project is being delivered to upgrade 10km of the M1 and is being constructing in packages to ensure faster delivery and best value for money.

An aerial view of the Pacific Motorway Eight Mile Plains to Daisy Hill upgrade project.

Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade

Work is being undertaken on the Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade, to improve 8kms of the Pacific Motorway (M1) between the Gateway Motorway and Watland Street.

Rochedale bus station and park n ride

Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade (Rochedale bus station and park 'n' ride)

As part of a rolling program of Pacific Motorway (M1) upgrades, detailed design for the Rochedale bus station and park 'n' ride is now complete.

No image supplied

Pacific Motorway, Exit 49, upgrade interchange

The Exit 49 interchange upgrade will deliver significant improvements in safety and traffic flow efficiency by keeping traffic moving through the improved interchange and thereby reducing queuing.

No image supplied

Recreational boating infrastructure

We own and maintain over 430 pieces of marine infrastructure valued at about $153 million. These include assets such as state boat harbours, boat ramps, jetties, pontoons, floating walkways, channels, and breakwaters/rock groynes.

No image supplied

Richmond - Winton Road, strengthen and widen pavement

The department will improve all weather access, travel reliability and safety along the Richmond – Winton Road by widening and strengthening this section of the road.

Rockhampton - Yeppon Intersection artist impression which is 4 roads with a traffic light intersection

Rockhampton Ring Road

The Rockhampton Ring Road is a long-term, visionary project for the Bruce Highway. It will unlock future economic growth and deliver significant benefits including improved flood resilience, freight efficiencies and road safety, and reduced travel times.

image of a section of Yeppoon Road

Rockhampton–Yeppoon Road, Yeppoon Road Upgrade Project

Rockhampton-Yeppoon Road is a regional road linking the Capricorn Coast, including tourist locations, such as Great Keppel Island to Rockhampton and beyond. 

No image supplied

Samford Road safety improvements

Construction is underway for a project to improve safety along a 1.5-km section of Samford Road, between Lomandra Access Road picnic area and Camp Mountain Road, and at the Camp Mountain Road intersection.

An unpaved road between a mountain and bollards

South Coast 2020–21 flood reconstruction works

Reconstruction works are underway across the South East Region, including the Gold Coast and Scenic Rim, to repair storm damaged roads.

No image supplied

South East Queensland Rail Stabling Program

We are working in partnership with Queensland Rail to develop a number of new purpose-built, modern train stabling facilities across the rail network critical to accommodate new trains delivered by the New Generation Rollingstock (NGR) project.

Landslip on Gold Coast - Springbrook Road

Southern Queensland 2022 flood reconstruction works

Repairs are underway across southern Queensland after extensive and severe damage to the state-controlled road network was caused by multiple heavy rainfall and flooding events in 2022.

No image supplied

Strathpine - Samford Road (Eatons Crossing Road and Mount Samson Road), improve intersection and route safety

Construction is underway for safety improvements on Strathpine-Samford Road between Eatons Hill and Samford Valley.

No image supplied

Tallebudgera Connection Road Koala Zone Trial

The department values the protection of native fauna and supports koala protection treatments and initiatives to help mitigate koala-vehicle collisions.

Artist's impression of the Torbanlea train manufacturing facility

Torbanlea manufacturing facility

A new facility is being constructed in the Maryborough region, to manufacture the Queensland Train Manufacturing Program fleet. 

No image supplied

Torbanlea – Pialba Road, various locations, upgrade intersections and floodways

Work is underway on flood immunity and intersection upgrades along sections of Torbanlea – Pialba Road between Beelbi Creek and Takura.

No image supplied

Townsville Connection Road (Idalia), University Road to Bowen Road Bridge, improve safety

The Townsville Connection Road is being upgraded to dual lanes between University Road and Bowen Road Bridge. The project includes upgrades at 3 intersections: Gartrell Drive, Mervyn Crossman Drive/Fairfield Waters Drive and Kokoda Street.

Artist impression of proposed new Trinder Park station with the Translink logo and Trinder Park sign on the front. Image is looking from Alexander Street with people out the front of the new station building and a train pulled up at a platform.

Trinder Park train station upgrade

Trinder Park train station is being relocated further north to be more centrally located between the Kuraby and Woodridge train stations. The relocation will improve safety and network efficiency due to its new straightened section of the track.

No image supplied

Varsity Lakes train station park 'n' ride upgrade

The Varsity Lakes station park 'n' ride upgrade is delivering close to 350 parking spaces.

Veloway 1 in use artist impression

Veloway 1: Pacific Motorway

The Veloway 1 is a dedicated cycleway running between Lower River Terrace, South Brisbane and Underwood. The 20km cycleway provides a safe and efficient route for bike riders.

Walkerston Bypass map detail several upgrades

Walkerston Bypass

The Walkerston Bypass will deliver a new 2-lane rural highway to connect Peak Downs Highway west of Walkerston to the Mackay Ring Road near Paget.

Artist impression of the proposed upgraded Woodridge station with the Translink logo and Woodridge sign on the front. Image is looking from Station Road and shows the new wider underpass with people out the front of the new station building and trains pulled up at the platforms.

Woodridge train station upgrade

Woodridge station is being upgraded to improve accessibility, safety and customer experience. 

No image supplied

Yandina—Coolum Road, South Coolum Road and School Road, upgrade roundabout

Construction is underway to replace the roundabout with a signalised intersection.

No image supplied

Yorkeys Knob—boat ramp