Showing results 21-30 of 48

Sort results
Sort results
  1. Isis Highway (Bundaberg – Childers), various locations, improve safety

    Isis Highway high risk roads targeted road safety program safety improvements...

    No image supplied
  2. Southern Queensland 2022 flood reconstruction works

    Repairs are underway across South East Queensland after extensive and severe flooding was caused by sustained heavy rainfall in late February 2022...

    Landslip on Gold Coast - Springbrook Road
  3. Gympie – Brooloo Road, design active transport crossings

    Detailed design is underway for active transport bridge structures and pathway to provide connectivity of the Principal Cycle Network from Gympie's southside into the Gympie CBD and surrounds...

    No image supplied
  4. Maryborough-Hervey Bay Road, Ibis Boulevard and Fairway Drive, intersection upgrade, business case

    Maryborough-Hervey Bay Road/Ibis Boulevard/Fairway Drive intersection upgrade...

    No image supplied
  5. Bruce Highway (Gympie – Maryborough), Tiaro Bypass, construct four lane bypass

    We are improving flood immunity, safety and efficiency on the Bruce Highway at Tiaro...

    No image supplied
  6. Bruce Highway—Cooroy to Curra

    This project involves a 62km realignment and upgrade of the Bruce Highway to 4 lanes between Cooroy and Curra and is among Queensland's highest priority road projects...

    No image supplied
  7. Pialba–Burrum Heads Road, O’Regan Creek, upgrade existing floodway

    This project aims to improve the flood immunity and reduce flood closure times at the Pialba–Burrum Heads Road crossing...

    Pialba–Burrum Heads Road, O’Regan Creek, upgrade existing floodway project location map
  8. Toowoomba–Cecil Plains Road, improve safety

    The project will design safety upgrades on Toowoomba–Cecil Plains Road...

    No image supplied
  9. New England Highway—(Yarraman-Toowoomba), widen pavement

    The New England Highway Pavement Widening project will improve safety and freight efficiency by widening a section of the highway to 10m...

    New England Highway Cooyar to Bum Bum Creek
  10. Bruce Highway (Cooroy to Curra) Section D

    The $1 billion Section D: Woondum to Curra (C2CD) project is a new 26km, 4-lane divided highway between the existing Bruce Highway interchange at Woondum, south of Gympie and Curra...

    Looking north towards an 8 span, 260 metre long concrete bridge structure over Deep Creek with construction crews on the bridge completing the final layer of pavement in preparation for linemarking. There is a bio-retention basin (like a sediment pond) in the foreground.