Cairns Transit Network
We have commenced planning for a new transit network for Cairns. This planning includes building a network to deliver dedicated public transport spines that will connect the length and breadth of...
We have commenced planning for a new transit network for Cairns. This planning includes building a network to deliver dedicated public transport spines that will connect the length and breadth of...
The study report determined that protection of the corridor within the local government planning scheme was not warranted at the time, and the project was closed...
Looking for a Department of Transport and Main Roads a form? Search our forms by category or form number...
We own and maintain over 430 pieces of marine infrastructure valued at about $153 million. These include assets such as state boat harbours, boat ramps, jetties, pontoons, floating walkways, channels...
The Cairns Transport Study will develop a strategy for the Cairns transport network that supports sustainable, efficient, equitable and affordable transport outcomes consistent with economic, social...
The Townsville Eastern Access Rail Corridor (TEARC) project is a proposed 8.3km rail freight line connecting the North Coast rail line directly into the Port of Townsville...
The Australian and Queensland Governments are investigating future rail requirements between Salisbury and Beaudesert...
We have finalised a preferred concept plan for the intersection of Stafford Road and South Pine Road, Everton Park...
We are undertaking a $1.25 million planning study to look at improving the capacity and efficiency of transport routes between Cairns and the Northern Tablelands...
The Queensland Government’s New Generation Rollingstock (NGR) project trains are providing will see aa significant increase to the capacity of the South East Queensland train fleet to meet the growing...